Sunday, June 7, 2009

Subfloor is Done!

The subfloor for the entire basement is finished! This is what we spent last weekend and this weekend doing.

A couple things to note... If you ever plan on doing your on sandwich subfloor stagger the joints. In other words, from sheet to sheet, never have a continuous join accross the whole floor. I staggered my joints. Between the tounge and groove OSB and the staggered joints the subfloor is super stable. Additionally, anywhere where there was a small gap from sheet to sheet I filled it up with construction adhesive. It is one strong floor!

Here are the final subfloor pics:

2 comments:

  1. You seem smarter than contractors on this stuff!

    ReplyDelete
  2. Thanks! That is a big reason I do this myself. So I can make sure it is done really well!

    ReplyDelete