As you can see, we no longer have a hole!
The Entire Redone SlabThere it is, the guys at FM Concrete poured this in about 45 minutes. Super fast! As you can see we have a stub up for the utility sink that will be in the storage room, a new floor drain, a box for the bathtub drain, and the vent for the tub right next to the box.
Where the Toilet Will BeAs you can see the toilet drain is stubbed up, so when we put the new floor down we will be able to cut it flush with the new floor.