Thursday, May 21, 2009

The Slab is Poured!

As I write this, it is currently 80 degrees in my basement. Why? Because the concrete slab has finally been refilled, and I have the heat up to help it dry! This is one of the few things I am not doing myself. I had FM Concrete of Aurora do the work and they did an amazing job. It is nice to have a "concrete guy" that I can trust with my concrete needs.

As you can see, we no longer have a hole!

The Entire Redone Slab

There it is, the guys at FM Concrete poured this in about 45 minutes. Super fast! As you can see we have a stub up for the utility sink that will be in the storage room, a new floor drain, a box for the bathtub drain, and the vent for the tub right next to the box.

Where the Toilet Will Be

As you can see the toilet drain is stubbed up, so when we put the new floor down we will be able to cut it flush with the new floor.